Skip to content

Free tools / Regional

Council of Architecture Fee Compliance Check

Check whether the fee you are about to quote sits below the statutory minimum.

Why this exists. Fee undercutting is the defining problem in Indian practice and no free tool tells an architect where the legal floor actually sits.

Excludes the price of land. Includes lifts, HVAC, transformers, DG sets and treatment plants.

Everything here is calculated in your browser. Your numbers are never sent anywhere, stored or seen by us.

Below the statutory minimum₹3,24,500 (3.25 lakh)Minimum for individual house is 7.50%, which is ₹3,75,000 (3.75 lakh).
Your fee at 5.00%
₹2,50,000 (2.5 lakh)
Statutory minimum at 7.50%
₹3,75,000 (3.75 lakh)
Differencebelow the minimum
₹1,25,000 (1.25 lakh)
Documentation and communication (10%)
₹25,000
GST at 18%
₹49,500
Retainer on appointment₹20,000 or 5 per cent of fee, whichever is higher, adjusted at the final stage
₹20,000
Stage release schedule, cumulative
StageCumulativeThis payment
1. Concept design and rough estimate10%₹25,000
2. Preliminary scheme and estimate20%₹25,000
3a. Drawings for client and statutory approval30%₹25,000
3b. On approval to commence35%₹12,500
4. Working drawings and tender documents45%₹25,000
5. Tender analysis and contractor appointed55%₹25,000
6a. Working drawings issued for site65%₹25,000
6b. 20 per cent of work complete70%₹12,500
6b. 40 per cent complete75%₹12,500
6b. 60 per cent complete80%₹12,500
6b. 80 per cent complete85%₹12,500
6b. Virtual completion90%₹12,500
7. Completion report and as-built drawings100%₹25,000

Your quote is ₹1,25,000 below the Council of Architecture minimum of 7.50%. Under the Architects (Professional Conduct) Regulations 1989 that is a matter of professional conduct, not just commercial preference.

A fee quoted near the minimum usually covers design and approval drawings only. The minimum and full service are different products, so comparing headline percentages is rarely like for like.

How this is calculated

  • Percentages are the Council of Architecture Scale of Charges, verified against the Council's own published schedule.
  • The retainer floor is ₹20,000. The schedule expresses it as 'Rs. 20M', where the Council's explanatory note states that the current value of M is 1000.
  • The fee base changes by stage: rough estimate at the start, preliminary estimate through design, accepted tender cost through tendering and construction, and actual cost of works on completion.
  • GST at 18 per cent applies to architectural services under SAC 998321. Confirm your own registration before invoicing.
  • Whether the minimum is enforced in practice is a separate question. Market rates commonly sit below it, and senior practitioners have publicly argued the scale has been rendered ineffective.

Sources

This is a planning estimate, not professional advice. Read the full disclaimer.

Undercutting is a symptom, not a strategy.

Studios quote low when they need the work. A free growth audit looks at why the pipeline is thin enough to make that necessary.

Talk to the founder